Runways
3 RWY, 3815m/12516ft 3 Runways, longest: 3815m/12516ft (paved)
Source: OpenAIP
Fuel Availability
Jet A1
Jet A1: Truck · 0500-2100 LT
Restrictions apply
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 4 kt
←R 5 kt
Wind
180° · 6 kt
Temperature
19°C
Dew point
12°C
Visibility
10km+
QNH
1014 hPa
Ceiling
Clear
2-Hour Trend
Temporary (TEMPO)
VFR
[SHRA BKN030CB]
→ Showers Rain (SHRA) · Broken (BKN) 3000ft CB
Thunderstorm activity expected or reported.
Cloud layers
5000
2500
0 ft
FEW 3300ft
METAR: 31 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 13 | ←R 5 kt | 4 kt ↑ |
| 24 | →L 5 kt | 3 kt ↑ |
| 06 | ←R 5 kt | 3 kt ↓ |
| 31 | →L 5 kt | 4 kt ↓ |
15:00Z → 17:00Z
VFR
[18008KT 9999 BKN035]
180° 8 kt · 9.7 km · Broken (BKN) 3500ft
15:00Z → 19:00Z
VFR
[PROB40 TEMPO 28013KT SHRA BKN030]
Probability (PROB) 40 Temporary (TEMPO)
280° 13 kt · Showers Rain (SHRA) · Broken (BKN) 3000ft TCU
Thunderstorm activity expected or reported.
CB
17:00Z → Tomorrow 06:00Z
VFR
[BECMG VRB03KT 9999 BKN035]
Becoming (BECMG)
Variable (VRB) 3 kt · 9.7 km · Broken (BKN) 3500ft
Tomorrow 06:00Z → Tomorrow 18:00Z
VFR
[BECMG 18010KT 9999 BKN035]
Becoming (BECMG)
180° 10 kt · 9.7 km · Broken (BKN) 3500ft
Tomorrow 11:00Z → Tomorrow 18:00Z
[PROB40 TEMPO SHRA SCT025]
Probability (PROB) 40 Temporary (TEMPO)
Showers Rain (SHRA) · Scattered (SCT) 2500ft TCU
Thunderstorm activity expected or reported.
CB
METAR EDDK 051450Z AUTO 18006KT 080V200 9999 FEW033 19/12 Q1014 TEMPO SHRA BKN030CB TAF AMD EDDK 051500Z 0515/0618 18008KT 9999 BKN035 PROB40 TEMPO 0515/0519 28013KT SHRA BKN030TCU BECMG 0517/0519 VRB03KT BECMG 0606/0609 18010KT PROB40 TEMPO 0611/0618 SHRA SCT025TCU
Useful Links
* = login required
Pilot Comments for EDDK
Johannes
Last update 2021-08-02: For two IFR approaches with low approach, EDDK was OK.
PPR for the IFR approaches on the day of flight had to be obtained in advance via the watch supervisor in Langen. Because other flight schools had already reserved capacity, we had to reschedule our flight.
Controllers and Tower were very friendly and helpful. As a slow 100 kt aircraft, we were vectored onto the approach just before the FAF. "Best forward speed" makes the controllers happy.
Between approaches a "visual break" is offered, which eases the workload for approach control and is therefore appreciated if accepted. For the approach to 14L, that meant turning left before the threshold and proceeding to Wipper VOR (essentially a tighter variant of SID WYP5F).
Landing was unfortunately prohibitively expensive.
Overall, an experience you do once for the EDDK experience. For regular IFR training, other airfields with higher training value are more suitable.
AirfieldBot
IFR and VFR operations are possible at EDDK, with friendly and professional ATC consistently highlighted. IFR approaches may require PPR on the day of flight, coordinated via Langen; capacity can be limited due to other bookings. Visual breaks between approaches are encouraged for training. VFR PPR can be obtained by email to the Verkehrszentrale. No ultralight aircraft are permitted.
Fees for non-commercial GA are high, with single-visit totals for landing, handling, parking, and related charges typically ranging from about €170 to €400 for short stays; overnight or multi-day parking can exceed €600 in some cases. Example: total charges about €250–€300 for a short stop including handling and parking; another example: fees, handling, and overnight parking about €400. Night landings or late arrivals incur significantly higher fees. Avgas is not available.
Ground handling is provided by BAC Cologne (ops@bac-cologne.com), with mandatory bus or van transfers between aircraft and the GAT/terminal area; walking access to the apron is not possible. The GAT is located outside the main airport area, requiring all passengers and crew to use shuttle transport. Follow-me service is standard to parking stands; pushback may be mandatory even when aprons appear empty, especially on certain stands.
Facilities at the GAT include a lounge, basic refreshments (coffee), and a flight planning room with internet access. Car hire can be arranged for delivery to the GAT; transfer times from landing to car keys are reported as efficient (as little as 12 minutes). Security procedures are thorough, with full scans for returning crew and passengers.
Access to downtown Cologne is convenient: after passport control at the crew facility, it takes about two minutes on foot to reach the train station, with rapid connections into the city.
Procedures vary; see AIP/NOTAM for operational details. EDDK offers efficient service and excellent ATC but is not cost-effective for routine GA use due to high fees and mandatory handling.