Runways
1 RWY, 2580m/8464ft 1 Runway, longest: 2580m/8464ft (paved)
Source: OpenAIP
05/23
Asphalt
Length
2580m
8464ft
8464ft
05/23
Asphalt
Length
2580m/8464ft
2580m/8464ft
Strength
1500/F/A/W/T
PCN
Fuel Availability
AVGAS
Jet A1
AVGAS, Jet A1: Truck · 0000-0000+1 UTC
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 12 kt
●
→L 15 kt
Wind
360° · 19 kt
Temperature
19°C
Dew point
16°C
Visibility
10km+
QNH
1015 hPa
Ceiling
1100 BKN
Cloud layers
5000
2500
0 ft
BKN 1100ft
BKN 2100ft
📝 Remarks click to expand
Raw remarks
RWY23 36014KT
METAR: 35 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 05 | ● →L 15 kt | 12 kt ↑ |
| 23 | ● ←R 15 kt | 12 kt ↓ |
06:00Z → 16:00Z
MVFR
[36020G30KT 9999 SCT012 BKN020]
360° 20 kt G30 · 9.7 km · Scattered (SCT) 1200ft · Broken (BKN) 2000ft
06:00Z → 10:00Z
[TEMPO -SHRA]
Temporary (TEMPO)
Light Showers Rain (-SHRA)
16:00Z → Tomorrow 06:00Z
VFR
[BECMG 34006KT 9999 NSW NSC]
Becoming (BECMG)
340° 6 kt · 9.7 km · No Significant Weather (NSW) · No significant clouds (NSC)
METAR LTBA 130720Z 36019KT 9999 -SHRA BKN011 BKN021 19/16 Q1015 RMK RWY23 36014KT TAF LTBA 130440Z 1306/1406 36020G30KT 9999 SCT012 BKN020 TEMPO 1306/1310 -SHRA BECMG 1316/1319 34006KT CAVOK
Useful Links
* = login required
Pilot Comments for LTBA
No pilot comments yet
Be the first to share your experience at LTBA
AirfieldBot
GA handling is mandatory, with all providers similarly priced; Gözenair is commonly used and offers helpful flight planning support and hotel arrangements. Expect high total fees. Example: total charges about €420. ATC service is professional and ICAO-compliant, with efficient IFR sequencing among airline traffic. GA parking is west of runway 18R, often requiring a long taxi after landing. Avgas delivery to parking is prompt. Transport to the city by taxi takes about 30 minutes and costs around €30. On departure, taxi drivers may have difficulty finding the GAT; contacting Gözenair for assistance is recommended. Billing can be slow and may differ from initial quotes, so keep documentation and be prepared to negotiate if needed. Entry procedures involve standard bureaucracy but are straightforward.