Runways
1 RWY, 2580m/8464ft 1 Runway, longest: 2580m/8464ft (paved)
Source: OpenAIP
05/23
Asphalt
Length
2580m
8464ft
8464ft
05/23
Asphalt
Length
2580m/8464ft
2580m/8464ft
Strength
1500/F/A/W/T
PCN
Fuel Availability
AVGAS
Jet A1
AVGAS, Jet A1: Truck · 0000-0000+1 LT
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 21 kt
→L 4 kt
Wind
40° · 21 kt
Temperature
28°C
Dew point
13°C
Visibility
CAVOK
QNH
1021 hPa
Ceiling
Clear
METAR: 14 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 05 | →L 4 kt | 21 kt ↑ |
| 23 | ←R 4 kt | 21 kt ↓ |
Tomorrow 04:00Z → Tomorrow 12:00Z
VFR
[BECMG 05020G30KT 9999 NSW SCT033]
Becoming (BECMG)
50° 20 kt G30 · 9.7 km · No Significant Weather (NSW) · Scattered (SCT) 3300ft
16:00Z → Tomorrow 04:00Z
VFR
[BECMG 05010KT 9999 NSW NSC]
Becoming (BECMG)
50° 10 kt · 9.7 km · No Significant Weather (NSW) · No significant clouds (NSC)
12:00Z → 16:00Z
VFR
[05020KT 9999 NSW NSC]
50° 20 kt · 9.7 km · No Significant Weather (NSW) · No significant clouds (NSC)
METAR LTBA 291450Z 04021KT CAVOK 28/13 Q1021 TAF LTBA 291040Z 2912/3012 05020KT CAVOK BECMG 2916/2919 05010KT BECMG 3004/3007 05020G30KT SCT033
Useful Links
* = login required
Pilot Comments for LTBA
No pilot comments yet
Be the first to share your experience at LTBA
AirfieldBot
GA handling is mandatory, with all providers similarly priced; Gözenair is commonly used and offers helpful flight planning support and hotel arrangements. Expect high total fees. Example: total charges about €420. ATC service is professional and ICAO-compliant, with efficient IFR sequencing among airline traffic. GA parking is west of runway 18R, often requiring a long taxi after landing. Avgas delivery to parking is prompt. Transport to the city by taxi takes about 30 minutes and costs around €30. On departure, taxi drivers may have difficulty finding the GAT; contacting Gözenair for assistance is recommended. Billing can be slow and may differ from initial quotes, so keep documentation and be prepared to negotiate if needed. Entry procedures involve standard bureaucracy but are straightforward.