Runways
1 RWY, 1628m/5341ft 1 Runway, longest: 1628m/5341ft (paved)
Source: OpenAIP
01/19
Asphalt
Length
1628m
5341ft
5341ft
01/19
Asphalt
Length
1628m/5341ft
1628m/5341ft
Strength
66/F/A/X/T
PCN
Fuel Availability
Jet A1
Jet A1: Truck
Restrictions apply
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 1 kt
←R 4 kt
Wind
80° · 4 kt
Temperature
24°C
Dew point
17°C
Visibility
10km+
QNH
1008 hPa
Ceiling
Clear
Cloud layers
5000
2500
0 ft
SCT 3500ft
METAR: 32 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 01 | ←R 4 kt | 1 kt ↑ |
| 19 | →L 4 kt | 1 kt ↓ |
09:00Z → 12:00Z
IFR
[PROB40 TEMPO 1996 TSRA FEW018 BKN025 BKN060]
Probability (PROB) 40 Temporary (TEMPO)
2.0 km · Thunderstorm Rain (TSRA) · Few (FEW) 1800ft CB · Broken (BKN) 2500ft · Broken (BKN) 6000ft
High probability of severe conditions in the forecast.
PROB40 TS
Thunderstorm activity expected or reported.
CB
03:00Z → 12:00Z
VFR
[14010KT 9999 SCT025 SCT060]
140° 10 kt · 9.7 km · Scattered (SCT) 2500ft · Scattered (SCT) 6000ft
METAR LGSK 240350Z 08004KT 9999 SCT035 24/17 Q1008 TAF LGSK 240200Z 2403/2412 14010KT 9999 SCT025 SCT060 PROB40 TEMPO 2409/2412 2000 TSRA FEW018CB BKN025 BKN060
Useful Links
* = login required
Pilot Comments for LGSK
No pilot comments yet
Be the first to share your experience at LGSK
AirfieldBot
PPR is required and must be arranged through the handling agent. Handling is mandatory, with handling and landing fees varying significantly. Example: landing about €150 and mandatory handling about €700; another example: landing about €40, handling about €30, PPR about €50, passenger fee about €20, commission about €10. No Avgas available. Parking for small aircraft is limited to 2–3 spaces. Tie-down rings are present but bring your own ropes. Bus service to town is available and car hire is not essential; taxi to town costs about €10. The airport is 3 km from town, with hotels, restaurants, and beaches within walking distance. Procedures vary; see AIP/NOTAM.