Operating times:
Daily 0600-2200 UTC; Summer · all flights · PPR required · outside published hours · 60 min before published closing time; Winter · all flights · PPR required · outside published hours · 60 min before published closing time; See AIP
Summer
Customs & Immigration:
Runways
1 RWY, 3406m/11174ft 1 Runway, longest: 3406m/11174ft (paved)
Source: OpenAIP
01/19
Asphalt
Length
3406m
11174ft
11174ft
01/19
Asphalt
Length
3406m/11174ft
3406m/11174ft
Strength
98/F/A/W/T
PCN
Fuel Availability
Jet A1
Jet A1: (3) Arriving aircraft: Aircraft refuelling will be permitted only if it is carried out within operational hours (PPR included).
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 21 kt
←R 8 kt
Wind
30° · 22 kt
Temperature
23°C
Dew point
19°C
Visibility
10km+
QNH
1022 hPa
Ceiling
1300 BKN
Cloud layers
5000
2500
0 ft
BKN 1300ft
METAR: 33 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 01 | ←R 8 kt | 21 kt ↑ |
| 19 | →L 8 kt | 21 kt ↓ |
Max 25°C (2513Z) · Min 21°C (2507Z)
17:00Z → 20:00Z
[PROB40 TEMPO FEW120]
Probability (PROB) 40 Temporary (TEMPO)
Few (FEW) 12000ft TCU
Thunderstorm activity expected or reported.
CB
19:00Z → Tomorrow 07:00Z
MVFR
[PROB30 TEMPO BKN014]
Probability (PROB) 30 Temporary (TEMPO)
Broken (BKN) 1400ft
17:00Z → Tomorrow 15:00Z
VFR
[04017KT 9999 SCT020]
40° 17 kt · 9.7 km · Scattered (SCT) 2000ft
METAR GCFV 241930Z 03022KT 9999 BKN013 23/19 Q1022 TAF AMD GCFV 241755Z 2417/2515 04017KT 9999 SCT020 TX25/2513Z TN21/2507Z PROB40 TEMPO 2417/2420 FEW120TCU PROB30 TEMPO 2419/2507 BKN014
Useful Links
* = login required
Pilot Comments for GCFV
No pilot comments yet
Be the first to share your experience at GCFV
AirfieldBot
Parking is cheaper than the AENA price list suggests. Handling is not mandatory as described in the AIP, but the walk from the GA apron to the GA terminal is about 600 meters; contracting transport only, for about €20, is possible and may be worthwhile. Slot coordination is required. Procedures vary; see AIP/NOTAM.