Operating times:
Mo–Fr 0630-2300 UTC; Sa/Su/Hol 0800-2200 UTC; PPR required; closed outside these hours
Winter
Customs & Immigration:
Customs: Mo–Fr 0630-2300 UTC / Sa/Su/Hol 0800-2200 UTC; PPR required; closed outside these hours • Immigration: Mo–Fr 0630-2300 UTC / Sa/Su/Hol 0800-2200 UTC; PPR required; closed outside these hours
Winter
Runways
1 RWY, 1806m/5925ft 1 Runway, longest: 1806m/5925ft (paved)
Source: OpenAIP
03/21
Asphalt
Length
1806m
5925ft
5925ft
03/21
Asphalt
Length
1806m/5925ft
1806m/5925ft
Strength
470/F/C/W/T
PCN
Fuel Availability
AVGAS
Jet A1
AVGAS: Self-service · Jet A1: Truck
Source: OpenAIP data. Contact FBO for pricing.
No recent fuel prices – report here. Airfield/FBO? Consider using Aerops.
Airport Webcams
Loading webcams...
↓ 16 kt
Wind
210° · 16 kt
Temperature
15°C
Dew point
14°C
Visibility
10km+
QNH
1008 hPa
Ceiling
1300 BKN
Cloud layers
5000
2500
0 ft
BKN 1300ft
METAR: 38 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 21 | 0 kt | 16 kt ↑ |
| 03 | 0 kt | 16 kt ↓ |
22:00Z → Tomorrow 03:00Z
[TEMPO 22018G30KT]
Temporary (TEMPO)
220° 18 kt G30
18:00Z → Tomorrow 03:00Z
IFR
[PROB30 TEMPO 7001 -DZ BKN009]
Probability (PROB) 30 Temporary (TEMPO)
7.0 km · Light Drizzle (-DZ) · Broken (BKN) 900ft
High probability of severe conditions in the forecast.
PROB30 IFR
18:00Z → 22:00Z
[PROB40 TEMPO 22017G28KT]
Probability (PROB) 40 Temporary (TEMPO)
220° 17 kt G28
18:00Z → Tomorrow 03:00Z
MVFR
[21014KT 9999 BKN015]
210° 14 kt · 9.7 km · Broken (BKN) 1500ft
METAR EGKB 261920Z 21016KT 9999 BKN013 15/14 Q1008 TAF EGKB 261704Z 2618/2703 21014KT 9999 BKN015 PROB40 TEMPO 2618/2622 22017G28KT PROB30 TEMPO 2618/2703 7000 -DZ BKN009 TEMPO 2622/2703 22018G30KT
Flight Times
DD . MM . YYYY
--:--
DD . MM . YYYY
--:--
Enter ETA/ETD and sign in to set your tailsign for personalized fees.
Additional information
⚠️ PPR Required
Prior permission required for landing
Useful Links
* = login required
Pilot Comments for EGKB
Timo
Great aerodrome for visiting London.
No PPR required, no handling needed. Everyone very friendly and helpful. Fuel and the ops office are efficient.
Landing fee: 60 pounds (SEP; MTOW 1497 kg)
Customs fee: 14 pounds
Parking: 17 pounds per day
From the aerodrome to central London by Uber/taxi is about 50–60 minutes for about 40 pounds. We also tried the taxi + public transport option; not worth it in terms of cost or time.
AirfieldBot
Biggin Hill offers both IFR and VFR access, with no handling requirement for non-commercial GA. IFR arrivals are vectored by Thames Radar, with ILS and VOR/DME approaches available; the ILS decision altitude is 730 ft. VFR arrivals are possible, but the airfield is surrounded by controlled airspace and has rigidly enforced noise-sensitive zones—avoid Kenley gliding site and follow published noise abatement procedures closely. PPR is required but filing a flight plan suffices for non-residents.
Landing fees for non-commercial GA under 2 t MTOW vary: Example: landing fee about £60; other examples range up to £140–£150 depending on services and duration. Border/customs levy typically about £20–£40. Parking for two to three days ranges from about £20 to £70. No handling fee is required for self-handled GA flights.
Fuel (Avgas and Jet A1) is available by truck, usually with quick service. Payment by credit card is accepted. On-field services include a crew lounge with complimentary drinks, briefing packs, and helpful staff; a new airport hotel is under construction.
Access to central London is straightforward: taxi or Uber to Bromley South station (typically 10–30 minutes, £20–£30), then direct train to Victoria Station in 15–20 minutes. Total journey time to central London is usually under an hour. Bus service to Bromley South also operates from outside the airport.
Customs/immigration are available on request; advance notification may be needed via the official UK general aviation notification form.
Biggin Hill is well-suited for GA visits to London, offering professional ATC, efficient ground handling, and good transport links. Strict adherence to noise abatement procedures is essential.